TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

BorWin1 Converter

The project name BorWin1, is derived from the 'Borkum Wind Park Cluster'. This is the first project which was carried out in DC technology and is the network connection for the BARD offshore 1. The connection from BARD platform to BorWin Alpha is 156kV 3 phase. The electricity produced by the wind turbine generators is converted to DC power and transported under the sea by HVDC tranmission and overland to the onshore converter station. To date this route is the world’s longest link constructed for connection of an offshore wind park to the land-side grid.
4C Offshore | BorWin1
Name
BorWin1 Converter
Status
Operational
Latitude
54.354°
Longitude
6.025°

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo